{"id":363,"date":"2025-09-17T14:43:01","date_gmt":"2025-09-17T14:43:01","guid":{"rendered":"https:\/\/cvbp.ro\/?p=363"},"modified":"2025-10-02T19:44:59","modified_gmt":"2025-10-02T19:44:59","slug":"primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea","status":"publish","type":"post","link":"https:\/\/cvbp.ro\/en\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/","title":{"rendered":"The first road passage in the country built with funding from the National Recovery and Resilience Plan (PNRR) \u2013 completed and put into use in Oradea"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Construction work on the road overpass on Calea Bor\u0219ului in Oradea was completed in October 2024 and the overpass was opened to traffic, marking an important moment in Romania's road infrastructure: it is the first overpass of its kind in the country to be built with funding from the National Recovery and Resilience Program (PNRR).<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The passage provides an essential link between the city of Oradea and the Bor\u0219 border crossing, facilitating mobility and improving traffic flow in the area. The total value of the project was approximately \u20ac11 million, of which \u20ac9 million came from European funds through the PNRR.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The overpass, built above a roundabout, has a total length of 1,043 meters, with two 300-meter ramps and a bridge approximately 70 meters long with an 18-meter span between the guardrails. The infrastructure includes two lanes in each direction and a height of 5.5 meters, contributing to increased safety and efficiency in road transport.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In addition to the underpass, the project also included the construction of a 2.2 km collector road connecting the roundabout under the underpass to the Intermodal Transport Center and the expressway to the Transylvania Motorway.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The entire investment, worth 53,736,466.14 lei (excluding VAT), was financed through the PNRR \u2013 Pillar 1 \"Transition to a green economy\", Component C4 \"Sustainable transport\".<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The design of this first road passage financed by the PNRR was carried out by our team at Costin and Vlad Design Office, and the works were executed by the association Freyrom SA, Procons Group SRL, and Construc\u021bii Erba\u0219u SA, in collaboration with the Oradea City Hall, the National Road Infrastructure Administration Company, and the Ministry of Transport.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">We are proud to have contributed to a landmark project for urban mobility and intermodal transport in Romania!<\/span><\/p>\n<div class=\"row\"  id=\"row-1322586568\">\n\n\t<div id=\"col-923731328\" class=\"col medium-6 small-12 large-6\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\t<div class=\"img has-hover x md-x lg-x y md-y lg-y\" id=\"image_1711936682\">\n\t\t\t\t\t\t\t\t<div class=\"img-inner dark\" >\n\t\t\t<img decoding=\"async\" width=\"1020\" height=\"678\" src=\"https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Z61_8308-compressed-1024x681.png\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Z61_8308-compressed-1024x681.png 1024w, https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Z61_8308-compressed-300x200.png 300w, https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Z61_8308-compressed-768x511.png 768w, https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Z61_8308-compressed-1536x1022.png 1536w, https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Z61_8308-compressed.png 1920w\" sizes=\"(max-width: 1020px) 100vw, 1020px\" \/>\t\t\t\t\t\t\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\n<style>\n#image_1711936682 {\n  width: 100%;\n}\n<\/style>\n\t<\/div>\n\t\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n\t<div id=\"col-1412056280\" class=\"col medium-6 small-12 large-6\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\t<div class=\"img has-hover x md-x lg-x y md-y lg-y\" id=\"image_312594460\">\n\t\t\t\t\t\t\t\t<div class=\"img-inner dark\" >\n\t\t\t<img decoding=\"async\" width=\"1020\" height=\"678\" src=\"https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Z61_8249-HDR-1-compressed-1024x681.png\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Z61_8249-HDR-1-compressed-1024x681.png 1024w, https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Z61_8249-HDR-1-compressed-300x200.png 300w, https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Z61_8249-HDR-1-compressed-768x511.png 768w, https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Z61_8249-HDR-1-compressed-1536x1022.png 1536w, https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Z61_8249-HDR-1-compressed.png 1920w\" sizes=\"(max-width: 1020px) 100vw, 1020px\" \/>\t\t\t\t\t\t\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\n<style>\n#image_312594460 {\n  width: 100%;\n}\n<\/style>\n\t<\/div>\n\t\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Lucr\u0103rile de construc\u021bie a pasajului rutier de pe Calea Bor\u0219ului din Oradea au fost finalizate \u00een octombrie 2024 \u0219i pasajul a fost dat \u00een folosin\u021b\u0103, marc\u00e2nd un moment important \u00een infrastructura rutier\u0103 din Rom\u00e2nia: este primul pasaj de acest tip din \u021bar\u0103 realizat cu finan\u021bare prin Programul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR). Pasajul asigur\u0103 [&#8230;]\n","protected":false},"author":1,"featured_media":321,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7,3,5],"tags":[],"class_list":["post-363","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-drumuri","category-poduri","category-toate"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Primul pasaj rutier din \u021bar\u0103 realizat cu finan\u021bare prin PNRR \u2013 finalizat \u0219i dat \u00een folosin\u021b\u0103 la Oradea - CVBP<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cvbp.ro\/en\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Primul pasaj rutier din \u021bar\u0103 realizat cu finan\u021bare prin PNRR \u2013 finalizat \u0219i dat \u00een folosin\u021b\u0103 la Oradea - CVBP\" \/>\n<meta property=\"og:description\" content=\"Lucr\u0103rile de construc\u021bie a pasajului rutier de pe Calea Bor\u0219ului din Oradea au fost finalizate \u00een octombrie 2024 \u0219i pasajul a fost dat \u00een folosin\u021b\u0103, marc\u00e2nd un moment important \u00een infrastructura rutier\u0103 din Rom\u00e2nia: este primul pasaj de acest tip din \u021bar\u0103 realizat cu finan\u021bare prin Programul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR). Pasajul asigur\u0103 [...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cvbp.ro\/en\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/\" \/>\n<meta property=\"og:site_name\" content=\"CVBP\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-17T14:43:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-02T19:44:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Servicii-de-proiectare-compressed-1024x681.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"681\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin_cvbp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_cvbp\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cvbp.ro\\\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cvbp.ro\\\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\\\/\"},\"author\":{\"name\":\"admin_cvbp\",\"@id\":\"https:\\\/\\\/cvbp.ro\\\/#\\\/schema\\\/person\\\/a14858bcbefe3aff4d2c3fac74cd5ab9\"},\"headline\":\"Primul pasaj rutier din \u021bar\u0103 realizat cu finan\u021bare prin PNRR \u2013 finalizat \u0219i dat \u00een folosin\u021b\u0103 la Oradea\",\"datePublished\":\"2025-09-17T14:43:01+00:00\",\"dateModified\":\"2025-10-02T19:44:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cvbp.ro\\\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\\\/\"},\"wordCount\":341,\"publisher\":{\"@id\":\"https:\\\/\\\/cvbp.ro\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cvbp.ro\\\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cvbp.ro\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/Servicii-de-proiectare-compressed.png\",\"articleSection\":[\"Drumuri\",\"Poduri\",\"Toate\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cvbp.ro\\\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\\\/\",\"url\":\"https:\\\/\\\/cvbp.ro\\\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\\\/\",\"name\":\"Primul pasaj rutier din \u021bar\u0103 realizat cu finan\u021bare prin PNRR \u2013 finalizat \u0219i dat \u00een folosin\u021b\u0103 la Oradea - CVBP\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cvbp.ro\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cvbp.ro\\\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cvbp.ro\\\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cvbp.ro\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/Servicii-de-proiectare-compressed.png\",\"datePublished\":\"2025-09-17T14:43:01+00:00\",\"dateModified\":\"2025-10-02T19:44:59+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cvbp.ro\\\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cvbp.ro\\\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/cvbp.ro\\\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cvbp.ro\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/Servicii-de-proiectare-compressed.png\",\"contentUrl\":\"https:\\\/\\\/cvbp.ro\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/Servicii-de-proiectare-compressed.png\",\"width\":1920,\"height\":1277},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cvbp.ro\\\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Prima pagin\u0103\",\"item\":\"https:\\\/\\\/cvbp.ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Primul pasaj rutier din \u021bar\u0103 realizat cu finan\u021bare prin PNRR \u2013 finalizat \u0219i dat \u00een folosin\u021b\u0103 la Oradea\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cvbp.ro\\\/#website\",\"url\":\"https:\\\/\\\/cvbp.ro\\\/\",\"name\":\"CVBP\",\"description\":\"CVBP\",\"publisher\":{\"@id\":\"https:\\\/\\\/cvbp.ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cvbp.ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cvbp.ro\\\/#organization\",\"name\":\"CVBP\",\"url\":\"https:\\\/\\\/cvbp.ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/cvbp.ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cvbp.ro\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo-costin-si-vlad-png-2-scaled.png\",\"contentUrl\":\"https:\\\/\\\/cvbp.ro\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo-costin-si-vlad-png-2-scaled.png\",\"width\":2560,\"height\":1810,\"caption\":\"CVBP\"},\"image\":{\"@id\":\"https:\\\/\\\/cvbp.ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cvbp.ro\\\/#\\\/schema\\\/person\\\/a14858bcbefe3aff4d2c3fac74cd5ab9\",\"name\":\"admin_cvbp\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/cvbp.ro\\\/wp-content\\\/litespeed\\\/avatar\\\/7690f32bf06f3ee4608743901e2ed504.jpg?ver=1776119688\",\"url\":\"https:\\\/\\\/cvbp.ro\\\/wp-content\\\/litespeed\\\/avatar\\\/7690f32bf06f3ee4608743901e2ed504.jpg?ver=1776119688\",\"contentUrl\":\"https:\\\/\\\/cvbp.ro\\\/wp-content\\\/litespeed\\\/avatar\\\/7690f32bf06f3ee4608743901e2ed504.jpg?ver=1776119688\",\"caption\":\"admin_cvbp\"},\"sameAs\":[\"https:\\\/\\\/cvbp.ro\"],\"url\":\"https:\\\/\\\/cvbp.ro\\\/en\\\/author\\\/admin_cvbp\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Primul pasaj rutier din \u021bar\u0103 realizat cu finan\u021bare prin PNRR \u2013 finalizat \u0219i dat \u00een folosin\u021b\u0103 la Oradea - CVBP","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cvbp.ro\/en\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/","og_locale":"en_GB","og_type":"article","og_title":"Primul pasaj rutier din \u021bar\u0103 realizat cu finan\u021bare prin PNRR \u2013 finalizat \u0219i dat \u00een folosin\u021b\u0103 la Oradea - CVBP","og_description":"Lucr\u0103rile de construc\u021bie a pasajului rutier de pe Calea Bor\u0219ului din Oradea au fost finalizate \u00een octombrie 2024 \u0219i pasajul a fost dat \u00een folosin\u021b\u0103, marc\u00e2nd un moment important \u00een infrastructura rutier\u0103 din Rom\u00e2nia: este primul pasaj de acest tip din \u021bar\u0103 realizat cu finan\u021bare prin Programul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR). Pasajul asigur\u0103 [...]","og_url":"https:\/\/cvbp.ro\/en\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/","og_site_name":"CVBP","article_published_time":"2025-09-17T14:43:01+00:00","article_modified_time":"2025-10-02T19:44:59+00:00","og_image":[{"width":1024,"height":681,"url":"https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Servicii-de-proiectare-compressed-1024x681.png","type":"image\/png"}],"author":"admin_cvbp","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin_cvbp","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cvbp.ro\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/#article","isPartOf":{"@id":"https:\/\/cvbp.ro\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/"},"author":{"name":"admin_cvbp","@id":"https:\/\/cvbp.ro\/#\/schema\/person\/a14858bcbefe3aff4d2c3fac74cd5ab9"},"headline":"Primul pasaj rutier din \u021bar\u0103 realizat cu finan\u021bare prin PNRR \u2013 finalizat \u0219i dat \u00een folosin\u021b\u0103 la Oradea","datePublished":"2025-09-17T14:43:01+00:00","dateModified":"2025-10-02T19:44:59+00:00","mainEntityOfPage":{"@id":"https:\/\/cvbp.ro\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/"},"wordCount":341,"publisher":{"@id":"https:\/\/cvbp.ro\/#organization"},"image":{"@id":"https:\/\/cvbp.ro\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/#primaryimage"},"thumbnailUrl":"https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Servicii-de-proiectare-compressed.png","articleSection":["Drumuri","Poduri","Toate"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/cvbp.ro\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/","url":"https:\/\/cvbp.ro\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/","name":"Primul pasaj rutier din \u021bar\u0103 realizat cu finan\u021bare prin PNRR \u2013 finalizat \u0219i dat \u00een folosin\u021b\u0103 la Oradea - CVBP","isPartOf":{"@id":"https:\/\/cvbp.ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cvbp.ro\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/#primaryimage"},"image":{"@id":"https:\/\/cvbp.ro\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/#primaryimage"},"thumbnailUrl":"https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Servicii-de-proiectare-compressed.png","datePublished":"2025-09-17T14:43:01+00:00","dateModified":"2025-10-02T19:44:59+00:00","breadcrumb":{"@id":"https:\/\/cvbp.ro\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cvbp.ro\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/cvbp.ro\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/#primaryimage","url":"https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Servicii-de-proiectare-compressed.png","contentUrl":"https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/09\/Servicii-de-proiectare-compressed.png","width":1920,"height":1277},{"@type":"BreadcrumbList","@id":"https:\/\/cvbp.ro\/primul-pasaj-rutier-din-tara-realizat-cu-finantare-prin-pnrr-finalizat-si-dat-in-folosinta-la-oradea\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Prima pagin\u0103","item":"https:\/\/cvbp.ro\/"},{"@type":"ListItem","position":2,"name":"Primul pasaj rutier din \u021bar\u0103 realizat cu finan\u021bare prin PNRR \u2013 finalizat \u0219i dat \u00een folosin\u021b\u0103 la Oradea"}]},{"@type":"WebSite","@id":"https:\/\/cvbp.ro\/#website","url":"https:\/\/cvbp.ro\/","name":"CVBP","description":"CVBP","publisher":{"@id":"https:\/\/cvbp.ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cvbp.ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/cvbp.ro\/#organization","name":"CVBP","url":"https:\/\/cvbp.ro\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/cvbp.ro\/#\/schema\/logo\/image\/","url":"https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/04\/logo-costin-si-vlad-png-2-scaled.png","contentUrl":"https:\/\/cvbp.ro\/wp-content\/uploads\/2025\/04\/logo-costin-si-vlad-png-2-scaled.png","width":2560,"height":1810,"caption":"CVBP"},"image":{"@id":"https:\/\/cvbp.ro\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cvbp.ro\/#\/schema\/person\/a14858bcbefe3aff4d2c3fac74cd5ab9","name":"admin_cvbp","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/cvbp.ro\/wp-content\/litespeed\/avatar\/7690f32bf06f3ee4608743901e2ed504.jpg?ver=1776119688","url":"https:\/\/cvbp.ro\/wp-content\/litespeed\/avatar\/7690f32bf06f3ee4608743901e2ed504.jpg?ver=1776119688","contentUrl":"https:\/\/cvbp.ro\/wp-content\/litespeed\/avatar\/7690f32bf06f3ee4608743901e2ed504.jpg?ver=1776119688","caption":"admin_cvbp"},"sameAs":["https:\/\/cvbp.ro"],"url":"https:\/\/cvbp.ro\/en\/author\/admin_cvbp\/"}]}},"_links":{"self":[{"href":"https:\/\/cvbp.ro\/en\/wp-json\/wp\/v2\/posts\/363","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cvbp.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cvbp.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cvbp.ro\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cvbp.ro\/en\/wp-json\/wp\/v2\/comments?post=363"}],"version-history":[{"count":4,"href":"https:\/\/cvbp.ro\/en\/wp-json\/wp\/v2\/posts\/363\/revisions"}],"predecessor-version":[{"id":369,"href":"https:\/\/cvbp.ro\/en\/wp-json\/wp\/v2\/posts\/363\/revisions\/369"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cvbp.ro\/en\/wp-json\/wp\/v2\/media\/321"}],"wp:attachment":[{"href":"https:\/\/cvbp.ro\/en\/wp-json\/wp\/v2\/media?parent=363"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cvbp.ro\/en\/wp-json\/wp\/v2\/categories?post=363"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cvbp.ro\/en\/wp-json\/wp\/v2\/tags?post=363"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}