Bistrița underground passages

  • Project status: Feasibility study
  • Client: The Administrative Territorial Unit of Bistrița Municipality

General Description

To improve traffic flow and road safety, a series of underpasses will be built on the main roads of Bistrița. Each underpass will ensure continuity of traffic flow, ease congestion, and increase pedestrian safety, being designed in accordance with modern technical standards.

Location

Altex Passage:

western part of the municipality of Bistrița, within the built-up area, Bistrița Năsăud County

Petrom Passage:

southwestern part of the municipality of Bistrița, within the built-up area

Mol Passage:

western part of the municipality of Bistrița, within the built-up area

Kaufland Passage:

western part of the municipality of Bistrița, within the built-up area

 

Pasaj Mol

  • Crosses: the intersection of DN 17 with Lucian Blaga Street
  • Type: underground passage
  • Technical specifications:
      • Road width: 2 x 3.50 m
      • Total carriageway width: 7.00 m
      • Total passage width: approx. 10.40 m
      • Total length (passage + ramps): approx. 289 m
      • Lungime pasaj: cca. 62.50 m
      • Clearance height: approx. 5.00 m
      • Superstructure: reinforced concrete slab
      • Infrastructure: secant piles, raft foundation.
      • Lifespan: 100 years
This site uses cookies to offer you a better browsing experience. By browsing this website, you agree to our use of cookies.