In July 2025, we completed the rehabilitation and consolidation works on county road 191G between the towns of Crasna, Marin, and Valcău de Jos in Sălaj County.
The rehabilitated section is 11.6 km long and was financed through the "Anghel Saligny" National Investment Program. The works were carried out over a period of 11 months.
Main works carried out:
- Reconstruction of the road structure with asphalt pavement to ensure the durability of the road under heavy traffic conditions;
- Construction of sidewalks in urban areas to increase pedestrian safety;
- Consolidation of the foundation soil by driving piles to stabilize the road foundation;
- Rainwater collection and drainage systems, contributing to traffic safety and extending the life of infrastructure;
- Installation of vertical and horizontal road signs to increase safety for all road users.
We are delighted to actively contribute to the development of infrastructure in Sălaj County through projects that bring safety, connectivity, and direct benefits to local communities.




